Advantages of Design/Build
-
You get early cost input from the contractor. A price is put
on conceptual design ideas as they are developed.
- A GUARANTEED MAXIMUM PRICE can be determined early, right after the
scope of the project is established.
- Time can be saved because construction can begin before the design is
completed. Example: architect could be completing interior designs while the
site and foundation work is underway. This technique is called FAST
TRACKING.
- The need for high cost change orders is eliminated.
- Architectural and engineering fees are kept to a minimum, and determined
from the beginning.
- Contractor fees are kept to a minimum, and determined from the beginning.
- Legal fees are kept to a minimum by eliminating the adversary roles.
- Construction costs are minimized by using the latest systems and methods
that the contractor KNOWS are cost effective.
- Chances for misunderstandings are minimized with the team approach.
- You get the best ideas from your team members due to the cooperative team
spirit.
- Realistic completion dates are established by the contractor who will do
the work.
- You can take advantage of special services such as preliminary feasibility
study, value engineering, and life cycle cost analysis.